Release doc: clarify changelog generation
This commit is contained in:
parent
fb2221aad7
commit
8eabb48e15
|
|
@ -50,11 +50,6 @@ First, can we even release the spec? This stage is mostly preparation work neede
|
||||||
to ensure a consistent and reliable specification.
|
to ensure a consistent and reliable specification.
|
||||||
|
|
||||||
1. Ensure `main` is committed with all the spec changes you expect to be there.
|
1. Ensure `main` is committed with all the spec changes you expect to be there.
|
||||||
2. Review the changelog to look for typos, wording inconsistencies, or lines which
|
|
||||||
can be merged. For example, "Fix typos" and "Fix spelling" can be condensed to
|
|
||||||
"Fix various typos throughout the specification".
|
|
||||||
3. Do a quick skim to ensure changelogs reference the MSCs which brought the changes
|
|
||||||
in. They should be linked to the GitHub MSC PR (not the markdown document).
|
|
||||||
|
|
||||||
## The release
|
## The release
|
||||||
|
|
||||||
|
|
@ -79,7 +74,13 @@ release.
|
||||||
2. Run `./scripts/generate-changelog.sh v1.2` (using the correct version number).
|
2. Run `./scripts/generate-changelog.sh v1.2` (using the correct version number).
|
||||||
The script will use the current date. If that date is wrong, correct the document
|
The script will use the current date. If that date is wrong, correct the document
|
||||||
by using the same `YYYY-MM-DD` date format.
|
by using the same `YYYY-MM-DD` date format.
|
||||||
3. Commit the result.
|
3. Review the changelog to look for typos, wording inconsistencies, or lines which
|
||||||
|
can be merged. For example, "Fix typos" and "Fix spelling" can be condensed to
|
||||||
|
"Fix various typos throughout the specification".
|
||||||
|
4. Do a quick skim to ensure changelogs reference the MSCs which brought the changes
|
||||||
|
in. They should be linked to the GitHub MSC PR (not the markdown document).
|
||||||
|
5. Commit the result.
|
||||||
|
6. Now is a good time to have someone else review the changelog.
|
||||||
5. Tag the branch with the spec release with a format of `v1.2` (if releasing Matrix 1.2).
|
5. Tag the branch with the spec release with a format of `v1.2` (if releasing Matrix 1.2).
|
||||||
6. Push the release branch and the tag.
|
6. Push the release branch and the tag.
|
||||||
7. GitHub Actions will run its build steps. Wait until these are successful. If fixes
|
7. GitHub Actions will run its build steps. Wait until these are successful. If fixes
|
||||||
|
|
|
||||||
Loading…