Instead of filtering tests assuming there are no two projects with same
name we always rebuild test tree from scratch and restore previos test
results in the list mode.
Fixes https://github.com/microsoft/playwright/issues/30396
This makes it easier to create helper functions like:
```ts
function createReporter(options: MyOptions) {
return ['my-reporter', options] as const
}
```
At the moment, such functions can't be passed to `reporters` because a
readonly array is not assignable to the expected mutable array.
Playwirght certainly doesn't require those arrays to be mutable so it
would make sense to relax this.
* FullConfig split into FullConfig and ConfigInWorker
* FullProject split into FullProject and ProjectInWorker
* Tests can only access {Config, Project}InWorker, while reporters can
only access Full{Config,Project}. This will allow in the future to
change the reporter API independently from the tests.
* Added documentation for the 4 classes.
Fixes#30040
# Context
In the `playwright.config` file, we can custom the default `timeout`
property for `expect.toPass` by the property:
```ts title='playwright.config.ts'
export default defineConfig({
// ...
expect: {
toPass: {
timeout: 60_000,
},
},
});
```
However, we can't customize the `intervals` option. So the default value
is always `[100, 250, 500, 1000]`.
# Goal
Add the possibility to customize the intervals option from the
`playwright.config` file.
```ts title='playwright.config.ts'
export default defineConfig({
// ...
expect: {
toPass: {
timeout: 60_000,
intervals: [1000, 2000, 3000]
},
},
});
```
* Add `Suite.entries` that returns tests and suites in their declaration
order
* Exposed `Suite.type` and `TestCase.type` for discriminating between
different entry types.
* Blob report format is updated to store entries instead of separate
lists for suites and tests.
* Bumped blob format version to 2, added modernizer.
Fixes https://github.com/microsoft/playwright/issues/29984
With the recent change that gave after hooks a separate timeout, fixture
teardown does not imply that "test finished successfully, but fixture
teardown was slow".
This was historically done to make `console.log()` have colors. However,
this makes any other code that checks `process.stdout.isTTY` incorrectly
assume real TTY support.
Node18 and Node20 now respect `FORCE_COLOR=1` in console, so our default
behavior of forcing colors in the worker process just works out of the
box. See https://github.com/nodejs/node/pull/48034.
Previously, there was at most one "hard error", as opposite to multiple
"soft errors". This was done to preserve the historic behavior at the
time of introducing multiple `TestInfo.errors`.
With this change, every user callback that is executed `withRunnable()`
can throw an error and/or timeout, and both of these will end up in
`TestInfo.errors`.
Additionally, there is at most one "unhandled exception" error, to avoid
flooding the report with mass failures.
Drive-by: remove boolean arguments from `_failWithError()`.
Fixes#29876.
When collecting dependencies both from CJS loader and from ESM loader,
the latter would overwrite the dependencies set instead of appending.
Also make sure cts/cjs/mts/mjs are all supported equally.
References #29747.
Test-specific output dir and snapshot names are trimmed to 60 chars
instead of just 100. The snapshot names are still trimmed at 100 chars
for backwards compatibility.
Reference https://github.com/microsoft/playwright/issues/29719